Edition · · ModulDim
The scalable product is a housing-delivery system, not just a factory.
Clayton demonstrates a mature manufacturing, distribution and financing system. BOXABL demonstrates access to attention and capital, but its 2025 accounts do not yet demonstrate profitable mass production. ModulDim’s immediate priority is repeatable handover of a serial home with an agreed complete budget, deadline and verified quality. AI should improve that process measurably, not substitute presentation claims for evidence.
Encyclopedia coverage
This is a broad initial registry of brands and candidates, not a census of legal entities or a market-share ranking. It includes related brands, importers, panel alternatives and historical candidates. A website establishes an offer, not audited factory operations, sales volume or solvency. The registry baseline was checked on 23 September 2026; market data and the SCANDI, Nordi House and HutJet offers were updated on 27 September 2026. Dates and financial periods are separate. Complete social, advertising, tender and key-person coverage still needs development.
Two listing journeys — different levels of maturity
Clayton Homes
From IPO to Berkshire
The IPO took place in June 1983, as recorded in Clayton's 1998 annual report. Berkshire's acquisition closed on 7 August 2003. Today Clayton has no separate publicly traded stock: it is a Berkshire subsidiary.
According to Berkshire's 2025 report, Clayton shipped 49,400 off-site homes and built around 10,000 site-built homes. The first category includes manufactured and modular housing, not just volumetric modular homes. 10-K accounts for approximately $12.9 billion in revenue and $1.9 billion in pre-tax earnings, including financial services. These figures are not directly comparable with BOXABL's Casita revenue.
What creates the advantage
Component manufacturing, home standards, retail and dealer channels, land development and buyer financing operate together. This narrows the gap between a manufactured home and a buyer able to install and pay for it. Our interpretation: factory efficiency is necessary, but alone cannot solve land, infrastructure, finance and service.
What to learn — and what not to copy
Learn from production discipline, supply control, distribution and the complete move-in journey. Do not copy the capital scale or lending without expertise and consumer-risk controls. ModulDim's first equivalent step is not becoming a “Ukrainian Berkshire”, but delivering a sequence of consistent contracts with measured margins. Adding new directions before that increases complexity rather than proving platform economics.
Limits of this case
US manufactured-housing rules, land availability and financing do not automatically translate to Ukraine. The accounts establish financial scale but neither a separate modular-line margin nor AI-native manufacturing.
BOXABL
A public listing is a fact; profitable scale is not yet proven
SEC 8-K records the closing of the FG Merger II merger on 17 July 2026. Nasdaq confirms BXBL trading began on 20 July 2026. This was a SPAC/de-SPAC transaction, not a conventional IPO. The $3.5 billion figure is the agreed transaction equity value at a notional $10 share price, not cash raised or current market capitalisation.
Product and commercial proposition
Folding transport geometry reduces shipping constraints; factory units can be combined. The current investor-relations page lists a base Casita from approximately $60,000 alongside a limited turnkey offer: Studio $140,000, one bedroom $185,000 and two bedrooms $200,000. Land and installation terms remain critical. Claimed totals of 800+ homes manufactured and 200,000+ inquiries are different corporate metrics and periods, not deliveries or sales.
What the accounts show
MD&A for 2025: revenue was $1.5 million versus $3.4 million in 2024; 23 Casitas were delivered to 15 customers versus 51 units in 2024; 73 were manufactured versus 140. Audited financial statements: net loss was approximately $57.5 million and operating cash outflow $47.175 million. The $17.116 million inventory adjustment included obsolete-unit write-offs and write-downs to net realisable value.
As of 27 March 2026, the same document reported cumulative totals of 795 manufactured and 312 delivered, and deposits from 7,818 prospective buyers. These have different denominators: inquiry ≠ deposit ≠ contract ≠ manufactured ≠ delivered ≠ occupied. We do not calculate conversion by mixing dates and cohorts.
Risks and lessons for ModulDim
SEC filings describe further capital needs, going-concern risk, permitting constraints, production scale-up and dealer/installer development. Marketing references to 28 patent filings do not mean 28 granted patents or proven protection against imitation. Social attention and a listing cannot substitute for margin and customer delivery.
Learn from product demonstrations, the modular platform and separating base from total prices. Do not present future cost targets as current facts. Housing OS should expose the difference between plan and execution, not create another attractive counter.
Update: Q1 2026
According to the unaudited quarterly MD&Areports revenue of $1.6 million versus $123,000 a year earlier, with 20 Casitas delivered to seven customers versus one unit. This is an improvement, but net loss was $7.6 million and operating cash outflow was $7.1 million. One customer accounted for 71% of revenue. Quarterly results are not an annual forecast or proof of profitable repeatability.
Comparative registry
Search the table and select a market/category. Select a name for the dossier with prices, lead times, channels and sources. A/B/C is our monitoring priority, not a competitor quality rating.
SCANDI
Primary website offer · 2026-09-27
Product / model
Serial timber homes; configurator, showroom and trial stays.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
The site mentions both 35 and 45 days; clarify starting point and conditions.
Evidence / gaps
1,400+ homes and 15 homes/month are self-reported. Foundation, delivery and installation appear in the offer; verify the contract.
Public professional roles
Serhii Lotsman — founder, according to the company website.
Official channels linked from the site
- https://www.instagram.com/scandiukr/
- https://www.facebook.com/ScandiUkr/
- https://www.youtube.com/c/SCANDIUA
Sources
Unitfab
Primary web offer · 2026-09-23
Product / model
Timber prefab housing and specialist modules; design and factory completion.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
About 3 months of production, according to the website.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Volodymyr Melnichuk — founder and CEO in an AIN column, 29 Apr 2024; reconfirm current role.
Official channels linked from the site
Sources
QHome
Primary web offer · 2026-09-23
Product / model
Residential and infrastructure modules; Ukraine/EU.
Price reference and scope
Forza 65.6 m² from $38,603; Siena 34.9 m² from $29,009. Catalogue prices, not move-in budgets.
Lead time / conditions
30–60 days depending on model; installation and site preparation are separate stages.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Roman Havriushenko — founder in a 2023 Narodna Rada report; reconfirm current role.
Official channels linked from the site
- https://www.instagram.com/qhome.ukraine/
- https://www.facebook.com/QHome.ua/
- https://www.tiktok.com/@qhome_ua
- https://www.youtube.com/@Qhome_Ukraine
Sources
Nordi House
Primary website offer · 2026-09-27
Product / model
Family models and compact modules. Do not confuse with other suppliers’ similarly named models.
Price reference and scope
Family 73/120: from UAH 21,500/m²; Barn 35/40: from UAH 22,000/m². Confirm package and terrace basis.
Lead time / conditions
30–45 days advertised; quick assembly is not the move-in lead time.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/nordi.house/
- https://www.facebook.com/nordihouses/
- https://www.tiktok.com/@nordihouse
- https://www.youtube.com/channel/UC4t_AMevI03-FS9SQIl04IQ
Sources
Unitbud
Primary web offer · 2026-09-23
Product / model
Modular homes with interior finishes; standard catalogue.
Price reference and scope
MB64: 64 m², $59,995; MB75: 75 m², $69,893. Catalogue with finishes; logistics/site scope not normalised.
Lead time / conditions
Up to 2 months of production, according to the site.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/unitbud.ua/
- https://www.facebook.com/modulni.budynki.unitbud.ua
- https://www.tiktok.com/@unitbud_ua
- https://www.youtube.com/@unitbudua
Sources
Scandinavia Home
Primary web offer · 2026-09-23
Product / model
Barn/Modern/Scandinavian; configurable/custom options. Separate brand from SCANDI.
Price reference and scope
Barn 66 from UAH 1,683,000; Modern 50 from UAH 1,175,000. Base without terraces; reconfirm scope and validity.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/scandinavia.home_official/
- https://www.tiktok.com/@scandinavia.home
- https://www.youtube.com/@scandinaviahome
Sources
Trident Modular Housing
Primary web offer · 2026-09-23
Product / model
Family, commercial and floating homes; Ukraine/Europe.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Own news about UBA 2026 ranking is a PR signal, not market-share evidence.
Public professional roles
Volodymyr Baikov — corporate news author; founder role not established.
Official channels linked from the site
- https://www.instagram.com/tridentmodularukraine/
- https://www.facebook.com/tridentmodularukraine
- https://www.linkedin.com/company/106347147/
- https://www.youtube.com/@TRDNT_UA
Sources
BudMall
Primary web offer · 2026-09-23
Product / model
Modular housing, SIP kits and tourism products; Kyiv/Lviv/Ternopil showrooms.
Price reference and scope
From $450/m² headline; equivalent complete specification not established.
Lead time / conditions
5 weeks advertised; distinguish kits from completed homes.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/budmall.center/
- https://www.facebook.com/budmall.center
- https://www.youtube.com/channel/UCMJcNcyQ_ZWEOPzGFWzgErA
Sources
Nano Hous Bud
Primary web offer · 2026-09-23
Product / model
Modular housing; custom design and claimed BIM capability.
Price reference and scope
Headline from UAH 25,000/m²; older references show different prices. Full scope not reconciled.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
HutJet
Primary website offer · 2026-09-27
Product / model
Broad modular platform: housing, hospitality, clinics, schools and floating units.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
3–6 weeks of manufacture and 1–2 days of installation, according to the official site. Site preparation and logistics are separate; this is not a guaranteed move-in date.
Evidence / gaps
Forbes BrandVoice, 27 Feb 2026, is sponsored content. Expansion plans are not actual production.
Public professional roles
Serhii Samusiev — founder in the BrandVoice interview.
Official channels linked from the site
- https://www.instagram.com/hutjet.house/
- https://www.facebook.com/HutJetDynamicHouse
- https://www.youtube.com/@HutJet_2025
Sources
HOMErs
Primary web offer · 2026-09-23
Product / model
Steel/PU prefab; housing, hospitality and enterprise. Not necessarily delivery of finished volumetric modules.
Price reference and scope
From $69,000; compare Basic/Comfort/Full House specifications.
Lead time / conditions
3–6 weeks headline; assembly 7–14 days, elsewhere 3–10. Clarify the model.
Evidence / gaps
80+ homes since 2022 and two UA/SK factories are site claims. 100+ homes/month is not verified actual output.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/homers_global/
- https://www.linkedin.com/company/homers-global/
- https://www.youtube.com/@HOMErsGlobal
Sources
Modulex / ArtMetal Ukraine
Primary web offer · 2026-09-23
Product / model
Steel/sandwich panels; schools, clinics, dormitories, offices and housing.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
1,000+ projects, 100,000+ m² and 100+ modules/month are site claims, not audited. ArtMetal is not counted as a separate factory.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/modulex_ukraine/
- https://www.facebook.com/modulex.ua
- https://www.tiktok.com/@modulex_ua
- https://www.youtube.com/@MODULEX_UA
Sources
WOODULEX
Primary web offer · 2026-09-23
Product / model
Timber modular homes; Modulex group brand, not an independent factory in producer counts.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Teplodim
Primary web offer · 2026-09-23
Product / model
Kryvyi Rih; welded steel frame, 150–200 mm insulation.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
3–4 weeks production and 1 day installation advertised.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Oleh Boiko — founder on the company website.
Official channels linked from the site
- https://www.instagram.com/teplodom.ua/
- https://www.tiktok.com/@teplodom.ua
- https://www.youtube.com/channel/UCPS0-cbn5iL5UoBZGUXLnuQ
Sources
Norvil
Primary web offer · 2026-09-23
Product / model
Timber frame; homes, rentals and saunas; Ukraine/EU.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/norvil.com.ua/
- https://www.tiktok.com/@norvil.com.ua
- https://youtube.com/@norvil-ukraine
Sources
Woodify
Primary web offer · 2026-09-23
Product / model
CLT and glulam; premium permanent housing. The exclusivity claim is not independently confirmed.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
ModulBud
Primary web offer · 2026-09-23
Product / model
Residential module production in Lviv region, according to the site.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Indexed page reviewed; automated homepage collection stopped according to robots.txt.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Moduler
Primary web offer · 2026-09-23
Product / model
Timber housing modules; showroom in Rovzhi, Avatar Village; also business applications.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
180+ modules and 50 handed-over homes are self-reported and use different units.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
ModulPrefab · .com.ua
Identity to verify · 2026-09-23
Product / model
Housing modules. Relationship to modulprefab.com not established.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
60 days and 10-year warranty are site claims; confirm warranty scope.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Modul-Prefab · .com
Identity to verify · 2026-09-23
Product / model
Lviv; panel-frame and modular homes. Potential brand duplicate; legal-entity reconciliation required.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Domus Corporation Modul
Primary web offer · 2026-09-23
Product / model
Europe Modular partner; municipal/social projects. Own Ukrainian factory not established.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Arlat Home
Primary web offer · 2026-09-23
Product / model
Timber housing modules; 21–100 m² portfolio. KOSHT calls it Alart Home but links to this brand.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/arlat_home_ua/
- https://www.facebook.com/arlat.home
- https://www.youtube.com/@ArlatHome
Sources
Eco Module
Primary web offer · 2026-09-23
Product / model
Housing modules including Nordi 61.2 m². Model name does not imply a relationship with Nordi House.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
PreBuild
Primary web offer · 2026-09-23
Product / model
Dnipro; light-gauge steel and sandwich panels; housing/commercial modules.
Price reference and scope
48 m² / UAH 960,000 on one page; other pages have different starting prices. Reconcile one specification.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Promkontrakt / Thermowood Production
Primary web offer · 2026-09-23
Product / model
Zhytomyr; timber modules, mobile homes and tourism developments. Lestorg and Datour are related sites.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
From 2 months on the homepage; 2–4 weeks refers to a specific summer-house kit.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Oleksandr Kozlovskyi — Thermowood Production founder in its Datour material.
Official channels linked from the site
- https://www.instagram.com/thermowood_eu/
- https://facebook.com/thermowoodproduction
- https://tiktok.com/@thermowood_production
Sources
Bauen Haus / BauenModule
Primary web offer · 2026-09-23
Product / model
SIP panels and finished modules; distinguish kits from site assembly.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/bauenhaus_ua/
- https://www.facebook.com/bauenua/
- https://www.youtube.com/channel/UCbWSXCieREIZEUaieX64q0g
Sources
Sipbud
Primary web offer · 2026-09-23
Product / model
SIP kits and construction; adjacent alternative, not every offer is a finished module.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/sipbud.com.ua/
- https://www.facebook.com/semendomsip/
- https://www.tiktok.com/@sipbud
Sources
Finnlog Ukraine
Primary web offer · 2026-09-23
Product / model
Timber/CLT, Finnlog OÜ network (Estonia); housing alternative, not evidence of Ukrainian volumetric manufacturing.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/finnlog_ukraine
- https://www.facebook.com/finnlog.ukraine
- https://www.youtube.com/@FinnlogUkraina
Sources
EurHome
Primary web offer · 2026-09-23
Product / model
SIP production and house kits; panelised alternative.
Price reference and scope
Kit prices must not be compared with habitable homes.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Euro Kabina
Primary web offer · 2026-09-23
Product / model
Serial rapidly assembled residential/business modules; Hepko partnership, according to the site.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/evro_kabina/
- https://www.facebook.com/evrokabina1
- https://www.tiktok.com/@evro.kabina
Sources
BlockModul
Primary web offer · 2026-09-23
Product / model
Residential and industrial rapid-build structures.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Historic KOSHT prices are not presented as the current 2026 price list.
Public professional roles
Not established in this review.
Official channels linked from the site
- https://www.instagram.com/block_modul/
- https://www.facebook.com/blockmodul
- https://www.youtube.com/@blockmodul_ua
Sources
SAVVATS
Primary web offer · 2026-09-23
Product / model
Steel structures and modular buildings; adjacent industrial player.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Module House
Primary web offer · 2026-09-23
Product / model
Custom residential/commercial modules; architecture and 3D design.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
3–4 months according to the site.
Evidence / gaps
5,900 m² facility and capacity for 50 simultaneous modules are stated capacity, not monthly sales.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
GoodWoodHome
Primary web offer · 2026-09-23
Product / model
Timber modular system, 13.5–49.5 m²; housing and glamping; configurator.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
From 60 days; installation after site readiness.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Technology Movement
Primary web offer · 2026-09-23
Product / model
Modular premises, compact houses and ancillary modules.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Zavod-Modul
Primary web offer · 2026-09-23
Product / model
Finished modular houses; Lviv region. Relationships with other brands not established.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
GLB Home
Primary web offer · 2026-09-23
Product / model
Premium modular homes; choice of interior design and specification.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
SIP ATLAS
Primary web offer · 2026-09-23
Product / model
SIP panels, complete walls and modules; housing and charity projects.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Politehbud Kompleks
Primary web offer · 2026-09-23
Product / model
Frame and modular structures; multi-region portfolio.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Dacha-Dim
Primary web offer · 2026-09-23
Product / model
Timber/frame prefab; adjacent housing alternative.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Tera Monada
Current activity to verify · 2026-09-23
Product / model
Social modular housing for people affected by war.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Historic 2022 brochure and company profile. Current operations and production need verification.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
SCANDDIM
Current activity to verify · 2026-09-23
Product / model
Historic candidate from KOSHT; not to be confused with SCANDI or Scandinavia Home.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Direct site unavailable during review. This does not establish company closure.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Module
Primary web offer · 2026-09-23
Product / model
US; design, modular manufacturing, Last Mile Facility and construction arm.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Cassette
Primary web offer · 2026-09-23
Product / model
US; factory-built housing and standardisation. Output and financial status not established.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Plant Prefab
Primary web offer · 2026-09-23
Product / model
US; panels and volumetric modules to architects’ designs. General contractor separately coordinates site work and delivery.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Veev by Lennar
Primary web offer · 2026-09-23
Product / model
US; closed-panel systems. Part of Lennar since 2023, not an independent startup peer.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Donald Povieng — President (company website).
Official channels linked from the site
Sources
nHouse
Identity to verify · 2026-09-23
Product / model
UK; standard self-build homes. Catalogue accessible; current manufacturer and contract volume not reconciled.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Hapi Homes
Primary web offer · 2026-09-23
Product / model
Panelised steel kits, configurator and installer network; not a completed volumetric box.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
12 weeks or less is a conditional marketing promise.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
CRATE Modular
Current activity to verify · 2026-09-23
Product / model
US; steel modules for multifamily/commercial construction, according to the directory.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Site could not be opened; company LinkedIn found. Confirm current operations.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Blokable
Current activity to verify · 2026-09-23
Product / model
US; affordable multifamily housing and vertical integration.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
A 2023 SEC Form C exists. Website unavailable; this does not establish current deliveries.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Dvele
Primary web offer · 2026-09-23
Product / model
US; high-performance homes, solar/batteries and Dvele IQ.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
270+ modules delivered, according to the site; not homes and not audited.
Public professional roles
Kurt Goodjohn — Co-founder & CEO (company website).
Official channels linked from the site
Sources
indieDwell
Current activity to verify · 2026-09-23
Product / model
US; social/affordable modular housing, according to the directory.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Direct website returned an error. Current legal and operational status not established.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Abodu
Primary web offer · 2026-09-23
Product / model
US; ADUs. Current site describes a move to a deployment platform for operators and municipalities.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Terms dated 2 Jul 2026 name Abodu Homes, Inc.; historic valuations are not transferred to the current business.
Public professional roles
Bobby Shokri — CEO (company LinkedIn).
Official channels linked from the site
Sources
Hampton Modular
Primary web offer · 2026-09-23
Product / model
US; builder/integrator working with Signature, Simplex and Custom Building Systems; not a separate factory.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Supplier claim; production and contract fulfilment not independently verified.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Guerdon
Primary web offer · 2026-09-23
Product / model
US/Canada; large volumetric multifamily, hospitality and workforce housing.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
200+ projects is a company claim; the site also describes Modufy AI planning. This review does not measure AI impact.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Kasita
Current activity to verify · 2026-09-23
Product / model
Historic micro-home case from the CB Insights list.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Current operator and live catalogue unconfirmed. Retained on watchlist, not among verified active producers.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
AVAVA Systems
Current activity to verify · 2026-09-23
Product / model
Historic timber joist-lock system from the CB Insights list.
Price reference and scope
No comparable all-in price established; specification required.
Lead time / conditions
Not established in this review.
Evidence / gaps
Current sales, team and official resource unconfirmed.
Public professional roles
Not established in this review.
Official channels linked from the site
Sources
Ukraine: market size, estimate boundaries and our entry segment
Review date: 27 September 2026. The latest detailed series in the supplied study ends in the first half of 2025. The measures below cover different scopes: we do not add them, treat them as a range for one TAM, or call them observed 2026 market volume.
UAH 6.60bn — a broad 2024 market estimate, up 29.2% on 2023. The revised Pro-Consulting study, Analysis of the Modular Construction Market in Ukraine, 2025, p. 11, reports UAH 6,602.07m. Formula: production 7,109.04 + imports 161.21 − exports 668.18 million UAH. Its basis is broad KVED 16.23 activity and prefabricated-building trade under HS 9406. This is the author’s industry estimate, not separately measured sales of ready-built family modular homes. Amounts are nominal, not inflation-adjusted. The publisher’s study page describes a different public version; the exact figures here come from the PDF supplied by the team, not that abstract.
UAH 5.42bn in H1 2025, up 64.3% year on year. The same series reports UAH 5,423.17m versus 3,301.03m in H1 2024. This is a half-year, not an annual result; doubling it is not an established forecast. Across 2019–2024 this series rose only 17.1% in nominal UAH, while 2024 remained 16.1% below 2021. Therefore this table does not support a claim that the market grew sixfold.
UAH 1.11bn — a narrower 2024 revenue basket of housing manufacturers. The table on pp. 31–32 totals UAH 1,109.46m, including 924.55m for named companies and an estimated 184.91m for “others”. It is a closer residential-segment reference, but not its exact market size: it includes panel/SIP products, possible exports and other legal-entity activities, with incomplete sole-trader and brand coverage. It cannot establish our market share. We do not add it to UAH 6.60bn.
37,100 single-family homes were commissioned in 2025. This covers all construction technologies, not just modular homes: LUN, Q2 2026 report, p. 14, citing the State Statistics Service. LUN also counts 288 cottage developments under construction nationwide in mid-May 2026, including 115 in Kyiv region. These are development projects, not homes or buyers. On p. 10, the median asking price of a resale house in Kyiv region is $115,000, up 15% year on year. It is not directly comparable with our factory home price excluding land and site works.
Trends and risks. LUN observes increased interest in private homes and autonomy in early 2026; search interest is not a paid transaction. KBU, 12 August 2026 reports labour shortages and rising construction costs. Our inference: standardisation, crew training and accurate material records may help protect price and delivery time. Purchasing power, war, energy supply and production costs nevertheless constrain demand and margin. Nominal turnover growth alone does not establish growth in the number of homes.
Competitors — checked 27 September 2026. SCANDI quotes 35 and 45 days in different site sections; 15 homes per month is self-reported, not independently verified Ukrainian sales. Nordi House advertises 30–45 days and starting prices of UAH 21,000–22,000/m² for selected models. HutJet advertises 3–6 weeks of manufacture and 1–2 days of installation; site preparation and logistics are separate. These timings are not guaranteed move-in dates, and prices do not represent matched complete specifications. Our UAH 27,000/m² does not prove that we are the cheapest. Our positioning is “Ready-built modular homes with premium design at an affordable price”; savings must be demonstrated on an equivalent scope.
TAM / SAM / SOM — keep the measures separate. UAH 6.60bn is a broad industry reference; UAH 1.11bn is a revenue basket of closer manufacturers, not a precise TAM. Our SAM is families in right-bank Kyiv region with a real budget, a suitable owned or selected plot and an intention to move; its monetary size is not yet established. Entry is through the Kyiv–Odesa highway showroom, billboards and targeted online invitations. Our execution target is ten accepted habitable homes per month by the end of month six after funding. That equals 120 annualised only if maintained, not a first-year forecast or proven SOM. Scaling nationwide sales follows repeatability in this pilot.
Source quality and next checks. The PDF reports 2024 production of UAH 7.11bn in its table but 4.8bn in its conclusions; the publisher’s public abstract gives 2bn. We therefore use the explicitly labelled tabular series rather than combine versions. Estimated “others” are 16.7% of the residential basket total although the text says 20%; search-statistics units also need reconciliation. The outlook to 2030 is the authors’ 2025 scenario, not an observed current result. Next steps: obtain the publisher’s methodological reconciliation, matched commercial quotations and our own viewing, contract, handover, margin and CAC data. Unknown does not mean zero.
The market is growing, but not every segment
The “autonomy market” is not one statistical category. It spans energy storage, solar generation, residential engineering and service. The signals below are comparable within their own sources, not an aggregate, TAM estimate or sales forecast for ModulDim.
Our interpretation: the need for energy resilience is a reason to test an integrated housing product. Yet growth in large-scale batteries does not establish household willingness to buy an autonomous home. We do not present a verified estimate of Ukrainian buyers of such homes or their budgets here.
Energy independence is part of autonomy, not its synonym
Backup power supports specified appliances for a limited time. An energy-independent modular home makes a more specific energy promise, but it needs a definition: which loads, for how many hours, in which season, and with what charging and backup arrangements. A battery or solar panels alone do not establish year-round off-grid living.
Housing autonomy is broader: electricity, heating, water, wastewater, connectivity and maintainability. Energy backup does not automatically provide water; a remote plot does not become safe simply because a home is autonomous.
For a separate future energy pilot, a candidate testable capability is: “the agreed critical appliances operate during an outage within the tested scenario”. Duration, specification and price will be published after calculations and an electrician’s tests. We would test “energy-independent” as a clearer message, not an already proven feature of our specification.
Two new signals do not yet confirm the trigger
S-01 · Montana City advertising. A screenshot supplied on 23 September 2026 markets a 126 m² cottage as energy-independent, with solar power, backup water, an on-site shelter and 24-month instalments. This is an observation of an adjacent competitor’s advertising, not verification of engineering, sales or modular construction. The original ad’s date and URL are unverified; montana.city was unavailable during our check.
S-02 · An anonymised Facebook post. A screenshot supplied on the same day describes a person without water and expecting a power outage despite using modern AI tools. This is one person’s concrete household problem. It does not establish a search for land, a housing budget, relocation intent or a purchase. We do not publish identities, faces, comments or the raw screenshot; the team’s own promotional reply is not independent demand evidence.
Conclusion: H-02 remains a hypothesis. We test the sequence “outage → unacceptable consequence → search for a solution → choice of a home or retrofit → actual commitment”. Alternatives include an apartment battery, a generator, renting an existing home or making no purchase.
A large long-term opportunity is not unlimited paying demand
Our investment hypothesis: homes with controllable essential systems may be useful beyond wartime. Comfort, predictable costs, remote work and less reliance on centralised services could sustain peacetime demand. AI and robotics might make remote work and maintenance easier, but they do not establish mass relocation to land-based homes.
What is known. The World Bank’s RDNA5 estimates that 14% of Ukraine’s housing was damaged or destroyed by the end of 2025, affecting over 3 million households. This measures housing need, not ModulDim buyers or our TAM. IEA, 2026 projects global data-centre electricity consumption rising from 485 TWh in 2025 to about 950 TWh in 2030. This is a data-centre forecast, not a forecast of household migration or inevitable outages in any particular city.
What challenges the thesis. UN DESA, 2025 projects a further increase in the urban population share through 2050. A suburban home can be part of an urban area; owning a plot does not necessarily mean rural living. We cannot promise that this lifestyle is always cheaper or healthier: total costs, transport, environmental quality and access to services matter.
How we narrow the opportunity. The initial segment is families in Kyiv and its region with a suitable plot, a specific outage scenario and an available budget. Suitable land, finance, safety, siting rules, manufacturing and service capacity constrain the reachable market. We do not add damaged housing to the battery market or equate total need with revenue. The first proof is an agreed, paid pilot, not the scale of the global problem.
A monthly payment is not necessarily a subscription: the BOXABL example
BOXABL Casita Studio explicitly describes its $895/month offer as financing. Its financing page describes credit options; actual payments depend on the model, location, site work, taxes, delivery, installation, credit approval and financing terms. Checked on 23 September 2026. This is not evidence of a BOXABL rental subscription or service MRR.
The lesson for ModulDim is to reduce the upfront financial barrier and disclose total costs. We will separately test genuinely recurring models: home rental, energy-module rental and maintenance. See the AI-native Autonomy as a Service concept.
A monthly review of the evidence
An automatic review is scheduled for the 1st of each month at 09:00 Kyiv time; the first scheduled run is 1 October 2026. We will check primary sources, changed offers and counterevidence, then update both languages and the journal. The editorial date never replaces the measurement period; missing new data does not become new numbers.
This is a local editorial task requiring the computer to be on, Codex to be open, and source and publishing access to be available. The schedule is configured; the first automatic cycle has not yet been verified.
Monitoring system: from registry to decisions
The frequency list below is a recommended editorial process. A monthly automatic review is also configured for the 1st at 09:00 Kyiv time, starting on 1 October 2026. It is a local task; the computer and Codex must be running. Sources and substantive conclusions are refreshed together, in both languages.
Direct competing offers
Weekly · A
Review catalogue, price/specification, promotions, stock, lead time, warranty, showroom, configurator and seven-day official-channel posts. Retain date, URL, excerpt/snapshot and old/new values. Role: market researcher; assignment not yet approved.
Market, media and actual deliveries
Monthly · B
Refresh all tier-B entries and discover regional players using synonyms. Classify media as editorial, contributed column, PR/sponsored or syndicated; deduplicate the same event across channels. In Prozorro reconcile legal entity, subject, amount and status: notice ≠ contract ≠ payment ≠ delivery. Public ad libraries show creatives/dates, not invented spending.
Company status and structural changes
Quarterly · C and international
Reconcile official filings, acquisitions/closures, teams, plants, approvals, patents and models. Historic candidates need new primary evidence of activity. Read subsequent available Clayton/BOXABL filings while preserving periods and group/home/module distinctions.
Decision-changing signals
Event-driven · after verification
New serial product, over 10% change in comparable all-in price, confirmed plant/major contract, ownership change or verified execution risk. 10% is a proposed threshold, not a historical norm. Alert format: change → evidence → impact → recommended action. Unchanged state generates no noise.
Close baseline gaps
First 30 days · after start approval
Days 1–7: reconcile brand/legal entity/factory and sources for tier A. 8–14: standard quote template and actual specifications; quote requests only after separate approval. 15–21: 90-day social/media history, channels, people and handover cases. 22–30: gap map, version 2 and pricing/process decisions. Relative timings are proposed.
Market memory without invented knowledge
Record-keeping rules
One brand card linked to legal entity/group. Every claim needs event date, review date, URL, source type, unit, specification, confidence and next review. Append changes rather than erase history. Access error ≠ business closure. Vacancies ≠ proven growth. Followers ≠ customers. Respect robots/service terms; do not bypass restrictions or collect private profiles.
What ModulDim should do
1. Fix one comparable offer: heated area separate from terrace; specification, foundation, delivery, crane, installation, connections, taxes and warranty.
2. Review 10–12 direct tier-A competitors against the same Kyiv-region site scenario. Do not claim lowest price from incomparable quotes.
3. Prove the first serial handover: planned/actual timing, complete price, rework, actual occupancy and permission for a case study.
4. Housing OS: reconcile schedules with crew capacity, materials and acceptance. Measure AI experiments through schedule error, rework and manual coordination; humans approve customer commitments.
5. Scale after repeatable delivery and positive economics including a warranty reserve, not after a spike in views.
Method and research backlog
Manual open-source review: SEC/Nasdaq/Berkshire/World Bank → company websites → specialist media → discovery directories. Direct CB Insights access returned 403; its indexed list supplied 15 names only, without paid profiles. Official social links were collected from homepages without login or bypassing restrictions.
Unfilled fields mean not established, not zero. A page does not establish an active factory. Remaining gaps: legal entity ↔ brand ↔ factory; independent handover records; complete quotes; current key people; 90-day media/social series; procurement deliveries; regional workshops and sellers without sites. Geographic SEO pages are not treated as factory locations. No private phone numbers, home addresses or rumours are published.
- SCANDI
- Unitfab
- Unitfab
- Unitfab
- QHome
- QHome
- QHome
- Nordi House
- Nordi House
- Unitbud
- Scandinavia Home
- Trident Modular Housing
- Trident Modular Housing
- BudMall
- Nano Hous Bud
- Nano Hous Bud
- HutJet
- HutJet
- HOMErs
- HOMErs
- Modulex / ArtMetal Ukraine
- WOODULEX
- Teplodim
- Norvil
- Woodify
- ModulBud
- Moduler
- ModulPrefab · .com.ua
- Modul-Prefab · .com
- Domus Corporation Modul
- Arlat Home
- Arlat Home
- Eco Module
- PreBuild
- PreBuild
- Promkontrakt / Thermowood Production
- Promkontrakt / Thermowood Production
- Bauen Haus / BauenModule
- Sipbud
- Finnlog Ukraine
- EurHome
- Euro Kabina
- Euro Kabina
- BlockModul
- BlockModul
- SAVVATS
- SAVVATS
- Module House
- Module House
- GoodWoodHome
- GoodWoodHome
- GoodWoodHome
- Technology Movement
- Zavod-Modul
- GLB Home
- SIP ATLAS
- Politehbud Kompleks
- Dacha-Dim
- Tera Monada
- Tera Monada
- SCANDDIM
- SCANDDIM
- Module
- Module
- Cassette
- Cassette
- Plant Prefab
- Plant Prefab
- Veev by Lennar
- Veev by Lennar
- Veev by Lennar
- nHouse
- nHouse
- Hapi Homes
- Hapi Homes
- Hapi Homes
- CRATE Modular
- CRATE Modular
- Blokable
- Blokable
- Blokable
- Dvele
- Dvele
- Dvele
- Dvele
- indieDwell
- indieDwell
- Abodu
- Abodu
- Abodu
- Hampton Modular
- Hampton Modular
- Guerdon
- Guerdon
- Kasita
- AVAVA Systems
- Berkshire 2025 annual report
- BOXABL 2025 MD&A
- BOXABL 2025 audited financial statements
- BOXABL Q1 2026 unaudited MD&A
- BOXABL merger 8-K
- Nasdaq corporate action
- Pro-Consulting · 2025 study (publisher abstract)
- LUN · Q2 2026, pp. 10, 14
- KBU · 12 August 2026
- SCANDI
- Nordi House
- HutJet
- SolarPower Europe · 28.01.2026
- IEA · 04.12.2025
- State Agency on Energy Efficiency · 4 September 2026
- BOXABL · Casita Studio
- BOXABL · Financing
- IEA · Key Questions on Energy and AI (2026)
- UN DESA · World Urbanization Prospects 2025
- World Bank · RDNA5 (2026)